Case Studies: Bessamaire Units at Work
Real jobs, real problems, built in Twinsburg, OhioEvery Bessamaire unit starts with a problem on a plant floor. Here are six recent jobs: what the customer needed, what we built, and what it delivered. Have a similar problem? Call us with the problem. We build custom units to spec.
Metal Manufacturing: Processing, Stamping, Welding and Paint Booth
The challenge: A 100,000 sq ft metal manufacturing plant needed conditioned make-up air and cooling across processing, stamping, welding and a paint booth, with an 80/20 recirculation and outside-air sequence.
The solution: Bessamaire HC Heating and Cooling units: direct gas-fired make-up air with chilled water cooling, running an 80/20 sequence (80% recirculated, 20% outside air).
The result: Temperatures held across the process and paint-booth areas, energy savings, and reliable uptime for production.
Warehouse Distribution and Assembly: Heating
The challenge: Heat a warehouse distribution and assembly area efficiently in cold weather, while bringing in fresh air to help keep the space clean.
The solution: A Bessamaire vertical JHV 80/20: 40,000 CFM, 80% recirculated and 20% outside air, with the flexibility to run 100% outside air, at 92% efficiency.
The result: Energy savings, steady temperatures and reliable uptime.
Food Processor: Egg Dehydration Room
The challenge: Create a hot room for egg dehydration and supply make-up air for the process.
The solution: Bessamaire JHI (Just Heat Indirect) custom air handling units: indirect gas-fired rooftop units that recirculate 80% of the room air and bring in 20% outside air.
The result: Drying performance met, energy savings, steady temperatures and reliable uptime. Indirect firing keeps combustion products out of the supply air. Why that matters.
Industrial Paint Booth: Make-Up Air
The challenge: Supply conditioned make-up air to an industrial paint booth, coordinated with the paint booth manufacturer.
The solution: A Bessamaire HC Heating and Cooling make-up air unit: 20,000 CFM direct gas-fired, with a condensing unit and DX coils, coordinated with the booth manufacturer.
The result: Supply-air conditions met, energy performance achieved and reliable uptime.
Wastewater Treatment Facility: All-Electric Make-Up Air
The challenge: Make-up air and heat for a wastewater treatment facility, with all-electric heat and 304 stainless steel construction required.
The solution: A Bessamaire 100% make-up air unit (JH Just Heat, electric) with Indeeco electric coils, built in 304 stainless steel.
The result: Heating performance achieved, energy-use goals met and reliable uptime.
Equipment Room Cooling
The challenge: A 20,000 sq ft equipment room, with equipment critical to the facility's operations, was cooled by ventilation only.
The solution: A 20,000 CFM Bessamaire EC Freshwater Evaporative Cooling™ unit.
The result: The room stays below 82°F, even with 95°F outside air.
Have a Problem Like These?
Tell us about the building, the people and the process. Our free needs analysis looks at air changes, exhaust, unit placement and budget before anything is built.
Contact Bessamaire today for expert assistance. We calculate air changes, optimize unit placement, and enhance employee well-being. Get budget estimates and comprehensive submittals from us.
Ready to Get Started?
Get In Touch With Our HVAC Experts
Give us a call or fill out the form below and we’ll be in touch as soon as possible. *marks required fields
